Search results
Resultaten voor
Everything must be right
Just like FIRST (Rotterdam), Hourglass (Zuidas) and the Booking.com headquarters (Oosterdokseiland), Linden fits perfectly in the list of prestigious projects of Van den Pol Elektrotechniek. “Another good impression.”
scoop rotterdam logistics park
At the two new DCs, Van den Pol is responsible for the distribution cabinets, lighting and security systems. “These are large distances. That’s why we install rail conduits. “A first is the use of Plastic Optical Fiber (POF)
Proud of the past, ready for the future
90 years of progress in electrical engineering
In a profession full of challenges, Van den Pol continues to prove himself. With an eye for relevant innovation, plenty of room for young talent and an increasing social impact. On the occasion of the 90th anniversary, Wim van den Pol looks back and forward to a future full of energy.
Hybrid energy system is crucial for top gifts
Our complete specialization has been deployed at the Topgeschenken distribution center
Energy management ensures optimal interaction of assets
Van den Pol Elektrotechniek is increasingly being called upon to find a solution for grid congestion. “That is the new reality, also at Utrecht Central Plaza, because the complex was not…
Parel in de polder for de vries en verburg
Stolwijk
LC 1220 Heembouw and van den Pol partners with an eye for detail
As a permanent partner of Heembouw, Van den Pol electrical engineering is already involved in the calculation phase of LC 1220
Najaar 2025
Elektro Internationaal
Woerden
ENERGY MANAGEMENT TACKLES GRID CONGESTION
Utrecht Central Plaza at Jaarbeursplein is being completely renovated, made more sustainable and expanded by contractor Ten Brinke. By the end of 2026, the vast majority of the 22,000 m2 of space in the complex will be occupied by De Volksbank. Then Utrecht Central Plaza meets high sustainability requirements.
Marnemoende battery system
IJsselstein
Van den Pol hits the right spot during the renovation of Brouwerij ‘t IJ
Fire alarm system Wageningen University
Wageningen
Albert Heijn lighting maintenance
Various locations
99 Apartments City West
Nieuwegein
Control over energy
Van den Pol balances consumption and capacity
Last Project
23 floors and 407 apartments
the tables have turned
Visiting KNRM
“De Wederkeringheid “
A special residential care complex is currently taking shape in the green heart between Zeist and Driebergen: Lievegoed de Wederkerigheid.
City Hotel
Gouda
PULS SPRING 2025
Making difficult easy
Making things difficult easy, it may sound like an old tax authorities slogan, but for us it is something we deal with on a daily basis.
Trusted co-maker
Concorde Utrecht
The Utrecht Merwedekanaal zone is familiar territory for Van den Pol electrical engineering. “In addition to Concorde, we have been active at De Nieuwe Defensie for many years,” says our business unit leader for residential construction, Bob Oostendorp.
‘Like a duck to water’
voorjaar 2025
Priority for affordable housing for young employees of Van den Pol Elektrotechniek
Today, youth housing provider 1828 Groep and Van den Pol Elektrotechniek signed a cooperation agreement. It has been agreed that young employees of this electrical installer will be given priority for an apartment in the 1828 branch in Gouda. And that the employees will install the electrical part at the Gouda branch.
Smarter with electricity
Limiting the consequences of grid congestion
De Kroon on Leeuwesteyn
UTRECHT
Theory comes to life
van den Pol provides HBO Talent with support
109 Apartments SAWA
Rotterdam
De Kroon at Leeuwesteyn is not just any new construction project.
It is an ambitious plan that literally bridges the gap between sustainability. modern living needs and the rich history of the city of Utrecht. Not only houses are being built here, but also a living environment that embraces both the present and the future.
Heineken building
Rotterdam
DC Amsterdam West
Dealing with grid congestion
As a permanent partner of Heembouw, Van den Pol Elektrotechniek is responsible for the basic electrical installation plus lighting at DC Amsterdam West. “Each of the four building parts has its own distribution box with consumption meter and can be used independently,” says project leader John Gielen. “The new building is all-electric and has energy label A++++.
Working through despite grid congestion
Grid congestion limits power use in numerous ways.
In extreme cases, plants even temporarily shut down or limit production. We help clients avoid that to continue to be able to do business. Our Green Team is the spider in the web in this regard. Read their experiences, tips and tricks here.
safe contractor
For the third year in row
Thanks for getting in contact with us
Sustainable, smart and future-proof
continuously looking for ways to work better and more efficiently.
najaar 2024
Obvious priority
JD Sports
Amsterdam
DISCLAIMER AND PRIVACY statement
17 houses and 85 apartments Porseleinenhof
Delft
67 apartments Palenstein
Zoetermeer
Switch to an integrated approach
Maximum capacity, lower costs
Indispensable for energy transition
Always mobile with smart charging
Sustainable lighting BENU pharmacy
amersfoort
battery storage system Marnemoende Marina
CONTINUED ENERGY SUPPLY
In Q1 of 2025 we will install a 466kWh battery storage system with a charging/discharging capacity of 200kW at our customer Marnemoende Marina.
solutions for a sustainable future
the william
amsterdam
Office completed The William
Amsterdam
Last Friday we were proud to have completed The William! This multifunctional office building developed by Nijkerk Holding BV has all conceivable facilities for an inspiring working environment.
pivot park – The Grizzly
Oss
Technology in the tent
groups 7 and 8 are interested in technology
Last Thursday, June 27, Woerdense-Techniek Talent (WTT) organized the 6th edition of Techniek in de Tent in Montfoort in collaboration with STAM, Veenbrink RVS and the Ondernemersfonds.
Vacheron
Amsterdam
AMAC
Utrecht
DEPT Agency
Amsterdam
High-level lighting
Utrecht
Apartments and houses Palenstein
Zoetermeer
NS Kiosk
Strong at stations together with Temmink
Making Amerpoort more sustainable
3,250 fixtures
Muntstad
Utrecht
“Entrepreneurs must help each other”
Balancing required during energy transition and grid congestion
“Entrepreneurs must help each other,” says Oene Venema, director Bedrijventerreinaanpak.nl They support the energy transition and help to keep grid congestion manageable.
Booking.com headquarters
Amsterdam
Further reduce footprint
Circular
Circular cable and junction boxes have been the standard at Van den Pol for some time. After extensive testing, only variants made of recycled plastic are used.
Futurahuis ter Aar – Champion with the same team
100% trust
Good bye
last diesel passenger car
first pile
1828 Gouda
Safety is certainly guaranteed
Expert in solar power
Save energy smartly
Always a future-proof network
Observing ever smarter
Flexible and scalable
No worries about safety
Key role for industrial automation
Better light, lower costs
PULS magazine
CO2 Performance Ladder
90 years of installation
Prominent specialist in electrical engineering
This is what we are proud of
Always the best solution
Assured of trust
Installing from the heart
Electrical engineering for retail
Constantly improving
Installations and lighting in top condition
Responsible partner
Collaborative specialist
Installing smarter and smarter
Sustainable partner in the energy transition
Most sustainable in the Netherlands
In the center
Smart and sustainable
Integrated approach limits consequences of grid congestion
The energy transition is increasingly being delayed by the overloaded power grid. Grid operator Stedin is already calling for a stop to the use of charging stations during the evening peak.
BREEAM-certificering
Sustainable lighting crucial for BREEAM certification
Voorjaar 2024
Pivot Park; “We are behind the wheel ourselves.”
BIM Crucial
We apply our specialism broadly at Grizzly. “We are connecting to the 10 kV installation of Pivot Park,” says our project leader Roelf.
Tag heuer
Amsterdam
IWC
Amsterdam
Panerai
Amsterdam
Futurahuis ter Aar – Champion with the same team
100% trust
KNRM contributes to the climate agreement
Towards a sustainable future
Booking.com Citycampus Amsterdam
“Delivered a top performance together”
Even though Booking.com’s City Campus was completed almost a year ago, our project manager Jan van den Brink is still proud.
Mall Sterrenburg
DORDRECHT
Charging infrastructure VvE Defensie Eiland
Woerden
Topclass players give Van den Pol new energy
Fresh from the eyes, straight on the chair
New light in Transpolis
BREEAM EXCELLENT AND A+ for a striking office complex
Energy square ERA Contour
Zoetermeer
DC Nabuurs
Amsterdam
VGI-Promatec
Hapert
Technical talent will become the new elite
A hidden gem
save and generate
flawlessly visible
Najaar 2023
bruna
dordrecht
project aan het water
Flexible installation keeps all options open
DC Nabuurs – Sustainable city distribution
Broad E-Specialism with cool details
Safety comes first at De Lichtpen in Amersfoort
Busy floors, safe construction site
Smoke detectors SSW
DE BILT
flink
Utrecht
Aviko Control
Poperinge België
booking.com
amsterdam
Voorjaar 2023
Nippon express
Schiphol
skins cosmetics
amsterdam
Sustainability of the LEk en Linge school community
Culemborg
DC Brocacef
Amsterdam
Innocent – de blender
Maasvlakte
House modernes
Utrecht
Bypass grid congestion and save money
collectively monitor power demand
Najaar 2022
little c apartments
rotterdam
beyond meat
Enschede
Solar System Oostveen
montfoort
Voorjaar 2022
new construction Wilco printing and binding
amersfoort
Sustainability of noviflora
Honselersdijk
Sustainability of the municipality of Nieuwegein
Schaap en Citroen
Amsterdam
Theo Pouw:
Ground cleaning
De Dubbelde Palmboom
rotterdam
Making St. Antonius Hospital more sustainable
Utrecht
liemès Fooddistrict
Utrecht
Dura Vermeer Innovation Centre
Utrecht
DC LKQ Fource
Berkel en Rodenrijs
121 Homes Haarzicht
VLEUTEN
Redevelopment of De Walvis
Amsterdam
intratuin
sustainability – woerden
Ourdomain
1550 homes Amsterdam
Bieze foodgroup
Nijkerk
DC Brocacef
Eindhoven
office tetris- parnassus tower
Amsterdam
Renovation Altrecht
zeist
dc plieger
amstelveen
Expansion and renovation of the Jan Snel BV office
Montfoort
New construction of residential care complex De Vijverhof
Capelle aan den IJssel
C&A
Eindhoven
groenendijk workwear
Woerden
Muziekids prinses maxima centrum – armin van buuren studio
Utrecht
sustainability stedin
Utrecht
Hotel Twenty Seven and restaurant Bougainville
Amsterdam
New construction Kiremko
Montfoort
Genmab
Utrecht