In the center
news about Van den Pol
Van den Pol is in the spotlight due to his crucial role in the energy transition. Read news here about high-profile projects, striking innovations, the achievements of our Club of 250 and the training of new technical talent.
DC Amsterdam West
Dealing with grid congestion
As a permanent partner of Heembouw, Van den Pol Elektrotechniek is responsible for the basic electrical installation plus lighting at DC Amsterdam West. “Each of the four building parts has its own distribution box with consumption meter and can be used independently,” says project leader John Gielen. “The new building is all-electric and has energy label A++++.
Working through despite grid congestion
Grid congestion limits power use in numerous ways.
In extreme cases, plants even temporarily shut down or limit production. We help clients avoid that to continue to be able to do business. Our Green Team is the spider in the web in this regard. Read their experiences, tips and tricks here.
safe contractor
For the third year in row
Sustainable, smart and future-proof
continuously looking for ways to work better and more efficiently.
battery storage system Marnemoende Marina
CONTINUED ENERGY SUPPLY
In Q1 of 2025 we will install a 466kWh battery storage system with a charging/discharging capacity of 200kW at our customer Marnemoende Marina.
Office completed The William
Amsterdam
Last Friday we were proud to have completed The William! This multifunctional office building developed by Nijkerk Holding BV has all conceivable facilities for an inspiring working environment.
Technology in the tent
groups 7 and 8 are interested in technology
Last Thursday, June 27, Woerdense-Techniek Talent (WTT) organized the 6th edition of Techniek in de Tent in Montfoort in collaboration with STAM, Veenbrink RVS and the Ondernemersfonds.
“Entrepreneurs must help each other”
Balancing required during energy transition and grid congestion
“Entrepreneurs must help each other,” says Oene Venema, director Bedrijventerreinaanpak.nl They support the energy transition and help to keep grid congestion manageable.
Further reduce footprint
Circular
Circular cable and junction boxes have been the standard at Van den Pol for some time. After extensive testing, only variants made of recycled plastic are used.
Futurahuis ter Aar – Champion with the same team
100% trust
Good bye
last diesel passenger car
first pile
1828 Gouda
Collaboration and integrated approach limit the consequences of grid congestion
The energy transition is increasingly being delayed by the overloaded power grid. Grid operator Stedin is already calling for a stop to the use of charging stations during the evening peak.
BREEAM-certificering
Sustainable lighting crucial for BREEAM certification
Pivot Park; “We are behind the wheel ourselves.”
BIM Crucial
We apply our specialism broadly at Grizzly. “We are connecting to the 10 kV installation of Pivot Park,” says our project leader Roelf.
100% trust
100% trust
KNRM contributes to the climate agreement
Towards a sustainable future
Booking.com Citycampus Amsterdam
“Delivered a top performance together”
Even though Booking.com’s City Campus was completed almost a year ago, our project manager Jan van den Brink is still proud.
Topclass players give Van den Pol new energy
Fresh from the eyes, straight on the chair
New light in Transpolis
BREEAM EXCELLENT AND A+ for a striking office complex
Technical talent will become the new elite
A hidden gem
save and generate
flawlessly visible
project aan het water
Flexible installation keeps all options open
DC Nabuurs – Sustainable city distribution
Broad E-Specialism with cool details
Safety comes first at De Lichtpen in Amersfoort
Busy floors, safe construction site
Bypass grid congestion and save money
collectively monitor power demand